Quality & Certifications

Transformer quality built on approved requirements and traceable records

Published evidence covers two management-system certificates, routine transformer testing and project-specific documentation control.

Transformer production and quality inspection

Verified management systems

Certificate references currently approved for publication

No additional accreditation, laboratory partnership or certification is claimed without a supporting document.

Certificate Q19102301

ISO 9001:2015

Published quality-management certificate for the stated manufacturing scope.

Certificate E19102301

ISO 14001:2015

Published environmental-management certificate for the stated manufacturing scope.

Evidence rule

Model- and project-specific proof

Certificates, declarations and test evidence must identify the applicable scope, transformer and revision.

Routine verification

Tests connected to the delivered transformer

The approved quotation and inspection plan define the final test scope. Published quality information includes the following routine checks.

01

Electrical identity

Ratio, polarity and winding resistance checks help verify the manufactured winding arrangement.

02

Insulation condition

Insulation resistance and agreed dielectric checks support the specified insulation system.

03

Performance values

Load-loss and other agreed measurements are recorded against the applicable rating and test basis.

04

Project records

Reports, nameplate data, drawings and manuals remain tied to the same delivered unit.

Quality evidence chain

What buyers should align before manufacturing

A certificate logo alone is not a complete acceptance package. The technical and quality records must refer to the same scope.

Project stageRecord to approvePurpose
QuotationTechnical data, deviations, guarantees and test scopeEstablish one comparable basis
EngineeringApproved drawings, data sheet and document scheduleFreeze interfaces and review points
ManufacturingInspection plan and controlled revisionsMaintain traceability through production
TestingProcedures, witness points and reportsVerify the agreed acceptance criteria
DeliveryNameplate, manuals, certificates and final registerConnect the delivered unit to its records

Publication boundary: ISO 45001, TÜRKAK, KEMA, university testing, type-test results or laboratory equipment are not stated until TZN supplies approved evidence for publication.